  BRIDGES
 
Bridges | Factory Structures | Institutional buildings |Housing | Factory products
| Autoclaved cellular concrete
| Joinery workshop | Other concrete products
 
HPL has the expertise of pre casting bridge spans in its factory and transporting these for erection at site. In certain contracts with the Indian Railways, HPL had to widen existing bridges by jacketting the old piers, removing the old spans and erecting new prestressed concrete spans to accommodate higher bridge load. This process is needed when the old bridges show conditions of distress or when the load carrying capacity of the entire route is to be upgraded. Since the bulk of activities were carried out in the factory or in a precasting yard near the work site, record construction times were achieved by HPL. For the modernisation of Delhi-Rewari line, the Northern Railways wanted upgradation of load carrying capacity of the bridges & also stipulated that the work be carried out under traffic blocks. Since traffic blocks are normally of the duration of one to two weeks at the most, the entire bridge super-structure was designed and precast in the factory, steam cured and transported to the bridge sites well in advance. The final operation of dismantling the old bridges and erecting the new spans was carried out by mobile cranes during the traffic blocks. Picture on the facing page shows a bridge on the Delhi-Rewari section of the Northern Railway built by this technique. Incidentally, the time period allowed was very short but was adhered to. 220 bridge spans were completed in just six months.


After the successful completion of 220 bridge spans in a record time of 180 days, on the Delhi-Rewari line of Northern Railway, HPL has been entrusted with the execution of many prestigious bridge projects by Indian Railways. Notable among these are:

 1) Strengthening of piers & abutments of SABI Bridge including the replacement of old steel girders by prestressed concrete girders in connection with conversion of Delhi-Jaipur Metre Gauge into Broad Gauge.

 2) Construction, supplying, leading & erection of PRC Slabs of Bridges in Jodhpur-Jaisalmer section of Northern Railway.

 3) Construction, supplying, leading & erection of PRC Slabs/RCC ballast retainers for bridge in Phulera-Merta Road Jodhpur, in Hissar-Jodhpur gauge conversion of Northern Railway.

4) Construction, supplying, leading & erection of PRC/RCC slab of Bridge in Delhi-Ambala section.

The art of efficient and fast working has to be mastered to serve clients in the infrastructure sector. Railway Bridges under traffic blocks and road over-bridges built at night, when the road traffic is low, are the forte of HPL. The railway over pass at Shahdara, Delhi was built under traffic blocks of just six hours. The girders were manufactured under factory conditions and erected at the site with the cranes.
«--Back
Home | About Us | Recognition | Memories | Services | Tenders | Dialogue | Annual Report
|
Publications | Press Releases/Handouts | Contact Us
Best view of this site on 800 X 6 00 screen resolution | Powered by Accent Infoways Pvt. Ltd.